From Wikipedia, the free encyclopedia
01-04-02
0700 Morning routine.
….
To the airport to leave on the 1120 hrs
flight to Ottawa. Cleared both
airports without problems, and checked into
hotel. Then to TSB Lab and worked the
afternoon with John GARSTANG, going over
exhibits and photos until 1900 hrs ADST.
Sorted some of the data that will be
required in the meeting this week, and
showed John the exhibits that were brought
along.
.....
John GARSTANG gave me a copy of the meeting
agenda, which is as follows:
Do write-ups
for:
1R Door
Deflector/Shroud SB & Observations
Production
Line Insulation Markings
MPET/MPVF
Location Observations/Contamination
Smoke Barrier
Openings
G1 Galley
Power Wire Routing Anomaly
G1 Galley
Bolt
Emergency
Battery Power Pack Installation Anomaly
Temperature
Assessment of Battery Power Pack & Lavatory
Smoke Alarm
Avionics
Quick Disconnect Panel AD/Rub Strip
Metallic-like
Deposit on Curtain
Metal-like
deposit on Cockpit Air Supply Duct
1R/1L Door
Panel Splatter
Review:
Heat
Release/Ignition Temp. Sample Collection
List